Cart

SARIT CENTRE, PT Floors, Site Supervision

Assignment: appointed by Somers Engineering Ltd to supervised the installation of PT (Post Tension) reinforcing cables as a cost and design effective flooring solution. The PT cables are reinforcement solution with approximate 4 times higher strength in comparison to conventional reinforcing bars.

The PT innovative solution provides savings in construction materials, higher quality finished product, savings in construction time; and an improved architectural and performing parking building with spaced columns to accommodate comfortable driving and parking experience.

Monday, 19 January 2026